SCB10-1600kVA/10-11kV Dry-type Transformer
Production DescriptionThe dry-type transformers supplied by our company are deigned and manufactured with the imported technology of resin-casting, vacuum pressure impregnating and GEORG silicon cutting machine. Product's technical performance fully comply with GB6450 standards and IEC726 standards.
Technical specifications:
Model |
No-load loss
(W) |
Load loss
(W) |
No-load Current
(%) |
Size
L*W*H (mm) |
Weight
(kg) |
SCB10-M-1600 |
2450 |
11730 |
0.9 |
1900*1800*1850 |
3450 |
The products have the following features:
1) high flame retardancy, with high safety factors for installation in load center;
2) low loss;
3) compact size, light weight and easy for installation;
4) No pollution and maintenance free;
5) high humid-resistance;
6) low partial discharge;
7) Strong mechanical strength and no crack;
8) low noise.
These dry-type transformers have been widely used for power transformation and transmission system, hotels, high buildings, commercial centers, stadium, petrochemical plant, airport, railway station and offshore platform. Especially when the installation space is limited, the installation is near load center or where special fire-requirements is given, the compact size and high flame-retardancy feature could have full advantages.
Service Conditions
- Cooling methods: There are totally two type of cooling methods, that is air natural (AN) and air forced. For transformers with AN or AF cooling methods, good air-ventilation should be guaranteed within the installation environment. When transformers are installed in environment with poor air-ventilation effect, heat-dispersion facilities must be added, the air ventilation volume should be considered and arranged as per 4m3/min. Different protection levels are provided: IP00, IP20, IP23 and etc...The altitude should be less than 1000 meters and ambient temperature should be lower than 40 C degrees. Otherwise, adjustment should be made as per GB6450 or IEC 726.
Product Loading and Unloading
- Transformer could be handled with forklift, crane-mobile and etc...Loading/unloading must be carried out as per Authority's regulations. At the four corners of the package (near the ends of the wooden pallet), marks of "lift from here" are painted. When lifting the transformers, steel rope should be placed here, as indicated in Fig. 1. For transformer without package or when lifting transformer from the package, the lifting plates on the transformer should be used, the angle between the steel rope should be less than 60 degrees, as indicated in Fig. 2. Special attentions should be given when loading and unloading the transformers.
Inspection & AcceptanceWhen customer receives the transformer, inspection should be carried out immediately.
- Check the information indicated in the nameplate conform to the order requirements, for example, product type, rated capacity, rated voltage, vector group, impedance and etc...Check whether the documents are complete. Check the components within the package conform to the packing list. Check whether the transformer is damaged during the transportation, whether transformer components is displaced or damaged during the transportation, whether the wirings are becoming loose, whether there is any crack or insulation damage, or whether there is polluted parts or foreign substances within the package. Meanwhile, if any supporting pole is used during transportation, please remove them. After inspection and if the transformer will not be put into operation immediately, the transformer should be re-packed and stored within the safe and dry indoor storages, to avoid the possible damages and stealing.
Company Profile:
Guangzhou Yibian Electrical Equipment Co., Ltd.
Guangzhou Yibian Electrical Equipment Co., Ltd., hereinafter referred to as (Guangzhou Yibian), was established in 2005 and is located in Panyu District, Guangzhou, the central area of the Pearl River Delta. The registered capital is 52.23 million yuan. The company covers a total area of 50000 square meters, including over 30000 square meters of modern factory buildings. It also has dedicated office buildings, technology research and development centers, product testing centers, employee dormitories, and green belts in the factory area, creating a beautiful environment.
The company has an elite team that is united, practical, and pioneering. There is a complete management structure including the Marketing Department, Production Department, Energy Storage Business Department, Quality Inspection Department, Supply Department, Technology Department, Senior Engineer Office, Finance Department, Administrative and Human Resources Department, and Enterprise R&D Institution Office. And the company has strong technical strength, with several senior engineers and mid to senior technical personnel with decades of work experience, as well as more than 60 production backbones, and a staff of around 100 people.
Guangyi Transformer specializes in manufacturing high-quality electrical equipment such as dry-type transformers (SCB), industrial and commercial energy storage equipment, medium and low voltage switchgear, prefabricated substations (YB), combined transformers (ZGS), oil immersed power transformers (S11/S13), etc. All products have formed a mass production scale, with advanced product technology, stable quality, reliable operation, and large-scale network operation. The product sales network is centered on the Pearl River Delta and Guangdong Province, gradually expanding to all parts of the country. Some products are exported to Mozambique, Rwanda and other places in Africa. The products are widely used in power systems, real estate enterprises, industrial and mining enterprises, municipal facilities, tunnels and bridges in various regions. The annual production capacity of dry-type transformers is 3.6 million kVA, prefabricated substations are 200 units, combined transformers are 200 units, oil immersed power transformers are 300000 kVA, and complete sets of equipment such as medium and low voltage switches are 2000 units.
Equipments of Our Company
Production Equipment:
![Scb10-1600 Dry Type Power Transformer 1600kVA 10/0.4kv](//www.micstatic.com/athena/img/transparent.png)
![Scb10-1600 Dry Type Power Transformer 1600kVA 10/0.4kv](//www.micstatic.com/athena/img/transparent.png)
![Scb10-1600 Dry Type Power Transformer 1600kVA 10/0.4kv](//www.micstatic.com/athena/img/transparent.png)
![Scb10-1600 Dry Type Power Transformer 1600kVA 10/0.4kv](//www.micstatic.com/athena/img/transparent.png)
FAQ
1. Q: Are you a manufacturer?
A: Yes, we are a professional manufacturer, specializing in Oil immersed transformer, Dry type transformer, Amorphous alloy transformer, Pad mounted transformer, Compact transformer substation, Switchgears, Circuit breaker, etc for over 19 years.
2. Q: What is the MOQ?
A: We accept OEM/ODM projects. The MOQ=1 unit. It would be great if you can provide technical drawing and technical specification document. If not, you can contact us for further communication.
3. Q: What is the production time?
A: It will take about 20-25 days based on the order requirements.
4. Q: What is the payment terms?
A: T/T, LC or Cash
5. Q: How long is the guarantee?
A: We offer 24 months(2 years) guarantee. The key parts over 30 years.